Home > About Us>Equipments

Equipments

Four process workshop:

1. Stamping workshop

The stamping line adopts the advanced system of ABB;

Uses the system of KBS(Dual robot rail system) , which be firstly used by ABB;

The first press in punch line uses the system of DDC (dynamic driving chain) ,which be secondly used in

 the Chinese market by ABB.


2. Welding workshop

Body line: SKID circulate delivery system;

The line of welding: ABB ROBOT;

Use the advanced automatic vehicle management system.


3. Painting workshop

Pretreatment electrophoresis: The swing rod chain continuously;

Drying furnace: The type of U drying chamber continuously;

Spray paint system: The spraying robot by FANUC's newest wall hanging type.


4. Assembly workshop

The trim and final conveying line : The FDS delivery system;

The chassis conveying line: FDS air friction delivery technology;

The detection line: the  Baoke brand system made in USA.





We use cookies to offer you a better browsing experience, analyze site traffic and personalize content. By using this site, you agree to our use of cookies. Privacy Policy